Astro Pak was called on to perform pre-operational work at an electric vehicle factory. The factory has an electrolyte system used to manufacture lithium-ion batteries. This system had multiple circuits with small diameter piping extending three stories high. To prepare them for service, they needed to be pressure tested, purged, flushed, sampled, and drained.