Critical System Cleanliness for

Data centerS

Astro Pak supports technical water networks and closed loop liquid cooling systems with engineering review, cleaning, flushing and cleanliness verification from planning and fabrication through commissioning and ongoing operation. Frontline Global Services, an Astro Pak company, brings complementary cleaning, flushing and fluid services to standby generator fuel and lubricating oil systems.

ASHRAE
Open Compute Project

critical fluid systems

Where We Work in a Data Center

Cooling fluid systems serving the data hall and fluid systems associated with standby generation have different operating and cleanliness requirements. Cleaning and verification methods are tailored to each system’s materials, fluid, configuration and project specifications.

Where We Work in a Data Center

Illustrative data center cutaway Server racks connect through technical water distribution and cooling equipment. Rooftop heat rejection equipment provides facility context. Standby generators occupy a separate area. System boundaries and configurations vary by facility.
Astro Pak

Technical Water & Liquid Cooling

Prepare cooling circuits for service and manage fluid conditions during operation, with work tailored to system design and project specifications.

  • High velocity flushing and chemical cleaning
  • Passivation of applicable stainless steel piping and components
  • Filtration, final fill support, and cleanliness verification
  • Fluid monitoring, maintenance, and corrective remediation
Frontline Global Services

Standby Generator Fluid Systems

Support the cleanliness of standby generator fuel and lubricating oil systems before commissioning and during operation.

  • Fuel oil piping decontamination, chemical cleaning, and high velocity flushing
  • High velocity lubricating oil flushing
  • Filtration and fluid purification
  • Particle count and cleanliness verification

facility lifecycle

Support Across the Data Center Cooling System Lifecycle

Astro Pak supports technical water networks and closed loop liquid cooling systems through preconstruction planning, construction and commissioning, and ongoing maintenance. When system conditions require corrective action, we also support remediation. At each stage, engineering and project management help align the work with system design, fluid requirements, work location, and project verification criteria.

01

PRE-CONSTRUCTION & ENGINEERING

Involve Astro Pak early to define cleaning requirements, the work sequence, and verification methods before construction begins. Our Engineering team reviews customer specifications, drawings, materials, flow paths, and fluid requirements. This review helps determine what can be processed before installation, what must be addressed after assembly, and how the completed work will be evaluated.

  • Engineering and system design review
  • Customer specification review and development
  • Cleaning process and flush plan development
  • Procedure and Method of Procedure (MOP) review and development

02

Construction & Commissioning

Astro Pak prepares technical water and liquid cooling systems for service with processes tailored to the project specification and system configuration.

  • High velocity flushing using water and glycol*
  • Chemical cleaning and sanitization
  • Passivation of stainless steel components and piping
  • Filtration, sampling and testing
  • Pressure testing
  • Drying, purging, system filling and air removal

*Flushing applications include piping (including CDU piping), expansion tanks, air separators, and valves.

Where the Work Happens

The specification, flow path, fabrication sequence, materials and site requirements determine which activities belong in each setting.

Pre-Installation

SHOP (Astro Pak or Customer's)

Process suitable piping, fabricated spools, modular assemblies and selected components. Dry, cap, protect and maintain traceability where required.

Division_Shop

Post installation

DATA CENTER SITE

Flush and clean the assembled system, including applicable equipment and piping. Perform filtration, support final filling and document the condition for turnover.

03

Maintenance

During operation, Astro Pak uses fluid sampling and analysis to assess condition against project specifications and identify early signs of contamination or fluid degradation. The findings guide targeted maintenance to help keep fluid within specified parameters, with work planned around facility operating requirements. Follow up testing and records document the resulting condition.

  • Fluid sampling, testing and analysis, including inhibitor levels, pH, conductivity, refractive index, turbidity and particle count
  • On demand filtration and flushing
  • Filter replacement and cleaning

+

Remediation

When fluid falls outside specification or contamination is identified, Astro Pak evaluates the affected circuit and selects corrective steps suited to its materials and operating requirements. Follow up testing documents the resulting fluid and system condition.

  • Live coolant replacement and chemistry adjustment
    (w/out taking down the system, where applicable)
  • Side stream filtration for particulate removal
  • Biological contamination or biomass removal
  • Corrective chemical cleaning, flushing and applicable passivation
    System refilling and waste removal

Tell us about your system, project stage, and cleaning or fluid management requirements. Astro Pak will help define the appropriate scope for construction, commissioning, or ongoing operation.

project experience

Documented Cleanliness for Cooling and Power

These projects show how planned flow paths and project specific verification supported the preparation of technical water and standby generator fuel systems.

Technical Insights

Explore the Details Behind the Work

The right processing and verification methods depend on the fluid, materials, equipment, and stage of the project. Explore these topics in greater technical depth.